Überrollbügel 997 ALU SSD, Einschraubteil incl.Tunnelstützstrebe

Referenz-Nr.: HEI 997 001 003A

NOK 14 240,00 zzgl. MwSt.
NOK 17 800,00 inkl. MwSt.
zzgl. Versand

Produktbeschreibungen

The Heilmann family at Heigo Motorsports Germany has been building extremely safe Roll Cage and Roll Bar Systems for Porsche since 1974. They have also produced countless factory and motorsports bars and cages for the marque over the years. FVD Brombacher proudly represents the Heigo product for its innovation, quality, safety and the long-standing history with the FIA and DMSB in Germany. They have hundreds of approval certificates to their name and maintain a meticulous safety record.

Features:
Bolt-in Bar from Heigo's Clubsport Series
B-Pillar Hoop – Single Diagonal Secured with Removable Clevis Joints
B-Pillar - Tunnel Supports Secured with Removable Clevis Joints
B-Pillar – Support Bars Secured to Outer Belt Locations with Clevis Joints
Chromoly Steel 1.5” Diameter Tubing / .098” Wall Thickness
Increases Roll Over Safety / Impact Safety and Chassis Rigidity
Tig Welded via Back Purging
Polished Aluminum Finish
For Street Use Only – A Harness Bar is Not Optional

Please Note: Heigo products are hand made to order in Germany. They typically take between 4-16 weeks. Every Heigo Bar or Cage is considered a motorsport part and is a special-order item. Motorsports parts may have some cosmetic inconsistency's (thin finish, light scratches, etc.).

Optionales Zubehör:
600006 Polstermaterial 2 X

Produktinformation

Auch bekannt unter HEI997001003A HEI.997.001.003A HEI-997-001-003A

Schlagworte

Videos

Individueller Service

Garantie

Falls Ihnen Teile nicht gefallen, können diese innerhalb von 14 Tagen zurückgesendet werden.
Auf Original-Teile gewähren wir eine Garantie von 12 Monaten. Ausnahmen siehe AGB.
Schnelle Lieferung

Shipment Damage

We advise that you unpack and inspect all merchandise immediately upon receiving it. If damage does not become apparent until the shipment is unpacked, make a request within 24 hours for inspection by the carrier’s agent and file with the carrier. Any external evidence of loss or damage must be noted upon arrival on the freight bill or carrier’s receipt and signed by the carrier’s agent. Failure to do this will result in the carrier refusing to honor the claim. For your protection, our billings include insurance for damage or loss in transit.
sichere Bezahlung